Interruptible Injection and Withdrawal Capacity Service

 

The service allows the System User to use interruptible injection and withdrawal capacities up to the triple amount of the firm injection and withdrawal capacity specified in the System User's contract(s).

 

Fee: 0.176 Ft/kWh 

Details

Sample contract