Service |
Duration/Sample contract |
Type |
Description |
Net fee |
Occasional |
Customized service |
Fulfilling injection and withdrawal requests at any time of the year on an interruptible basis in the direction opposite to the direction of flow announced for the period. |
0.325 HUF/kWh/day |
|
1 year |
Customized service |
Full availability of the withdrawal capacity, regardless of the fill level |
1.625 HUF/kWh/year |
|
1 year |
Customized service |
Purchasing additional firm withdrawal or injection capacity for those with storage contract. |
Annual: injection capacity 25.994 HUF/kWh/year, withdrawal capacity 25.994 HUF/kWh/year Daily: injection and withdrawal capacity 0.325 HUF/kWh/day |
|
Daily |
||||
Daily |
Customized service |
Possibility of nominating hydraulic balancing gas (HEG) to the extent of the total booked capacity, exceeding 10% of the daily allocated quantity. Payable on the allocated quantity |
0.065 HUF/kWh/day |
|
Intra Gas Day Storage |
Daily |
Customized service |
Possibility to modify between each hour the hourly nominations for the rest of the day, for a fee, in excess of the specified tolerance range, during nomination and/or re-nomination. |
0.325 HUF/kWh/day |
Occasional |
Customized service |
System User uses stored gas owned by MFGT under a loan contract for a specified period |
Loan fee: to be determined during the auction See also: Description of Gas Loan Storage Service |
|
Data Plus |
1 year |
Customized service |
Reporting fundamental data (Daily Stock Level) to ACER |
HUF 25,000/month |
Gas Loan Plus Service |
Occasional |
Customized service | System User uses stored gas owned by MFGT under a loan contract for a specified period. Working gas, injection and withdrawal capacities shall mandatorily belong to the borrowed Gas Quantity. |
Servicefee: to be determined during the auction See also: Description of Gas Loan Plus Storage Service |
Interruptible Injection and Withdrawal Capacity Service |
Occasional |
Customized service | The service allows the System User to use interruptible injection and withdrawal capacities up to the doubleamountof the firm injection and withdrawal capacity specified in the System User's contract(s). | 0.0176 HUF/kWh |